Fahmy, A, Hassan, T, Bassioni, H and McCaffer, R (2019) Dynamic scheduling model for the construction industry. Built Environment Project and Asset Management, 10(03), 313–30.

Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: hedonic regression modelling. Built Environment Project and Asset Management, 10(03), 389–406.

Ling, F Y, Zhang, Z and Wong, W T (2020) How personality traits influence management styles of construction project managers. Built Environment Project and Asset Management, 10(03), 453–68.

Mathar, H, Assaf, S, Hassanain, M A, Abdallah, A and Sayed, A M (2020) Critical success factors for large building construction projects. Built Environment Project and Asset Management, 10(03), 349–67.

Mwesigwa, R, Nabwami, R, Mayengo, J and Basulira, G (2020) Contractual completeness as a cornerstone to stakeholder management in public private partnership projects in Uganda. Built Environment Project and Asset Management, 10(03), 469–84.

Shojaei, P and bolvardizadeh, A (2020) Rough MCDM model for green supplier selection in Iran: a case of university construction project. Built Environment Project and Asset Management, 10(03), 437–52.

Shooshtarian, S, Lingard, H and Wong, P S (2020) Using the cost of construction work to trigger legislative duties for WHS: the Australian experience. Built Environment Project and Asset Management, 10(03), 369–87.

Vilventhan, A and Rajadurai, R (2019) 4D Bridge Information Modelling for management of bridge projects: a case study from India. Built Environment Project and Asset Management, 10(03), 423–35.

Wuni, I Y and Shen, G Q (2020) Stakeholder management in prefabricated prefinished volumetric construction projects: benchmarking the key result areas. Built Environment Project and Asset Management, 10(03), 407–21.

  • Type: Journal Article
  • Keywords: Benchmarking; Key result areas; Off-site manufacturing; Prefabricated prefinished volumetric construction; Project team; Stakeholder management;
  • ISBN/ISSN: 2044-124X
  • URL: https://doi.org/10.1108/BEPAM-02-2020-0025
  • Abstract:
    Prefabricated prefinished volumetric construction (PPVC) projects are industrialized building systems that are co-created. Thus, effective management of the involved stakeholders is required to ensure project success. However, knowledge of how best to manage the diverse stakeholders in PPVC projects is limited. This research identified and prioritized the success factors or key result areas (KRAs) for the effective stakeholder management (SM) in PPVC projects.Design/methodology/approach A quantitative research design was implemented involving a literature review and structured questionnaire survey with international PPVC experts. The research identified and statistically analysed 12 KRAs for SM in PPVC projects.Findings Analysis showed that the top three KRAs for SM in PPVC projects include: effective working collaboration, communication and information sharing among participants; effective coordination of the PPVC supply chain segments; and early involvement of relevant stakeholders in the PPVC project. A factor analysis clustered the 12 KRAs into stakeholder analysis and early involvement, effective communication and information sharing and stakeholder interest integration and conflict management.Practical implications The paper identified and prioritized the KRAs required for the effective SM in PPVC projects. To practitioners, the results may serve as decision support on the key areas to focus to ensure effective SM in PPVC projects and may guide the efficient allocation of limited resources.Originality/value This research constitutes the first exclusive attempt at identifying and benchmarking the generic KRAs required for effective SM in PPVC projects and contributes to the SM body of knowledge in industrialized construction.

Yap, J B H and Chow, I N (2020) Investigating the managerial ‘‘nuts and bolts’’ for the construction industry. Built Environment Project and Asset Management, 10(03), 331–48.